SocietyBee
    Billing
    Automated maintenance & charge billing
    Collections
    Track payments, send reminders
    Accounting
    Double-entry ledger & bank reconciliation
    Reports & Compliance
    Bye-law compliant statutory reports
    BeeAgent AI
    Natural language queries on your data
    For CAs & Accountants
    Manage all societies from one login
    For Treasurers
    Simple billing & audit-ready records
    For Managing Committee
    Visibility without the spreadsheets
    Docs
    Step-by-step guides for every module
    Blog
    Society management guides & tips
    Glossary
    Accounting & society terms explained
    vs MyGate
    Accounting vs gate security app
    vs ApnaComplex
    Multi-society CA login vs per-society pricing
    vs SocietyRun
    BeeAgent AI & zero gateway commission
    vs NoBrokerHood
    Accounting vs marketplace app
    vs Excel
    Audit trail & statutory reports vs spreadsheets
    Pricing
    Sign inStart free →
    Blog/Lift and Fire Safety in Housing Societies: Is Your AMC Real?
    English·मराठी·हिंदी
    Bye-Laws & Compliance7 min read

    The Lift Stopped Between Floors, and No One Noticed for 90 Minutes

    After a child died in a stuck lift in Pune, and a fire audit found only 489 Form B filings, one thing stands out. The rules exist. The checking does not. Here is how a committee can close that gap.

    YR

    Yogesh Randive

    Founder, SocietyBee

    21 October 2026
    01

    What Happened in Pune

    In late May this year, a seven-year-old boy at Riddhi Siddhi Apartment on Sinhagad Road, Pune, walked into the society lift alone, pressed a button and got stuck between floors. By reports, nobody realised he was missing for about ninety minutes. By the time the fire brigade forced the doors open, he was unconscious. He did not survive.

    About ten weeks later, in Katraj, five residents including a toddler were trapped in a lift at Rutugandha Society after a technical snag. This time the fire brigade reached in time and everyone came out unhurt. The year before, in Wagholi, six residents were injured when a lift in a newly occupied complex dropped. The endings differ, but the root cause looks the same: a lift that was not being watched closely enough by the people responsible for it.

    02

    The Same Pattern in Fire Safety

    After a fire on the 12th floor of a residential tower in Undri killed a teenager, and the building's sprinklers and alarms reportedly failed to work, Pune Municipal Corporation gave societies a seven-day ultimatum to get their fire systems working.

    Months later, PMC fire department data told the real story. Thousands of societies, hotels and commercial establishments are required to self-certify their fire systems every six months on Form B, and only 489 had submitted it. Everyone agreed something had to change. Almost nobody filed the paperwork.

    03

    The Rules Exist. The Checking Does Not.

    The law is not thin here. Under the Maharashtra Lifts, Escalators and Moving Walks Act, 2017, a lift needs a licence from the Electrical Inspector (Lifts), and as reported, the licence is renewed every five years and the Electrical Inspectorate is meant to carry out safety inspections twice a year, separate from your AMC. For fire safety, PMC requires high-rise buildings to get Form B (or Form D, depending on category) recertified every six months by a licensed agency, confirming that sprinklers, alarms, fire doors and water supply actually work. Check the exact forms and timelines that apply to your building and city.

    What keeps failing is the second step: making sure the inspector or technician actually comes, actually tests the equipment instead of signing at the gate, and actually gets paid to repair what is found broken. A monthly AMC visit that does not open the logbook is not maintenance. It is a visit. A fire system tested once at installation seven years ago is not a fire system. It is decoration.

    Free to try

    Managing a housing society?

    Auto-generate bye-law compliant bills, track collections, and produce audit-ready reports — free for societies up to 50 flats.

    Get started free
    04

    Why Committees Find Out Too Late

    Most committees learn that a lift licence or a fire certificate has lapsed only after something goes wrong, because nobody owns the calendar. Treasurers track money. Secretaries track letters. Almost nobody is asked to track dates: when the lift licence is due, when the last safety inspection happened, when the fire certificate needs filing, and when the AMC contract itself is up for renewal. That last one often comes with a price hike and a quiet cut in scope that nobody notices.

    05

    What a Committee Should Do Differently

    None of this needs a new law or a large budget. It needs a few habits:

    • Read your lift and fire AMC contracts again. Compare what they promise every month with what has actually happened. If the contract promises a monthly visit with logbook entries for brakes, cables, lubrication and sensors, ask to see the logbook. If it has not been signed in three months, you have an invoice and not an AMC.
    • Keep the AMC and the statutory inspection separate. Your lift vendor's monthly service is not the Electrical Inspectorate's safety inspection. Your housekeeping staff's fire check is not the licensed agency's Form B or D recertification, which has to be filed with the municipal fire department and not left in a drawer. You should be able to produce both papers independently.
    • Put a name against every renewal date. Not 'management will handle it', but one committee member for the lift licence, one for the fire certificate and one for the AMC renewal.
    • Track dates in one shared place that survives a change of committee. A shared spreadsheet with reminders works. So do society management tools that let you log AMC visits, upload certificates and get reminders before expiry. The point is that a lapse becomes 'the system warned us three weeks ago' and not 'we forgot'.
    • Do a quarterly walk-through yourselves. Check that fire extinguishers have not expired, the lift logbook is current, and the exits are not blocked by someone's extra almirah.
    06

    Small Safety Habits Around the Lift

    The Sinhagad Road incident also points to something simple. A child alone in a lift should be a rare event, and the lift should have a working alarm and intercom that someone actually hears. Test the alarm button and the intercom during the monthly AMC visit, make sure it rings at the security desk, and tell the guard what to do the moment it does. Ninety minutes is a long time for a button to ring in an empty room.

    07

    Put the Cost in the Budget

    Safety work is easy to postpone because the cost is certain and the benefit is invisible. Show AMC fees, statutory inspection fees and repair of defects found as separate lines in the budget, so the General Body can see what safety costs and what has been spent. A repair flagged in an inspection report that is not funded is a risk the committee has chosen to carry.

    08

    The Real Gap

    The boys in these incidents were not unlucky in some abstract way. They were in buildings where a maintenance system that looked fine on a contract had quietly stopped working in practice. The gap between 'we have an AMC' and 'the AMC is actually happening' is the real safety failure in most housing societies, and it can be fixed without waiting for the government to force the issue.

    FAQ

    Frequently Asked Questions

    Does a lift in a Maharashtra housing society need a licence?

    Yes. Under the Maharashtra Lifts, Escalators and Moving Walks Act, 2017, a lift needs a licence from the Electrical Inspector (Lifts). As reported, it is renewed every five years. Check the current rules with the Electrical Inspectorate.

    Is a lift AMC the same as the statutory inspection?

    No. The AMC is a service contract with a vendor. The statutory inspection is carried out by the Electrical Inspectorate, which is reported to inspect twice a year. A society should be able to produce both papers.

    What is Form B in Pune?

    Form B is the fire safety certificate that PMC requires certain buildings to renew every six months through a licensed agency. Form D applies to some categories. Check which one applies to your building.

    How many societies have filed their fire safety forms in Pune?

    PMC fire department data reported by the media showed that only 489 had submitted Form B, out of thousands of societies, hotels and commercial establishments required to file.

    What should a committee do first?

    Collect your lift licence, your last inspection report, your AMC contract and your fire certificate in one folder. Then put one named person against each renewal date.

    Explore in SocietyBee

    • Reports & Compliance
    • Accounting & Ledger

    Official & Reference Sources

    • Pune Tragedy: 7-Year-Old Boy Dies After Getting Trapped in Lift at Sinhagad Road Society, The Bridge Chronicle
    • Pune: Lift Crash in Wagholi Housing Complex Leaves Six Injured, Punekar News
    • Fire Safety Pune: Audit Form B Status of Housing Societies and Hotels, Navbharat Live
    • Pune: After Undri Fire Tragedy, PMC Orders Housing Societies to Fix Firefighting Systems Within 7 Days, Pune Pulse
    Share:WhatsAppLinkedIn
    YR

    Yogesh Randive

    Founder, SocietyBee

    Yogesh built SocietyBee after spending years helping housing societies in Mumbai manage accounts in Excel. He writes about Maharashtra co-operative law, society accounting, and the practical realities of running a housing society in India.

    In this article

    1. What Happened in Pune
    2. The Same Pattern in Fire Safety
    3. The Rules Exist. The Checking Does Not.
    4. Why Committees Find Out Too Late
    5. What a Committee Should Do Differently
    6. Small Safety Habits Around the Lift
    7. Put the Cost in the Budget
    8. The Real Gap
    9. Frequently Asked Questions

    Related articles

    View all →
    For CAs9 min read

    Housing Society Annual Audit Checklist: What Your CA Needs

    Audit season doesn't have to be a panic. This checklist covers every document, register and account your CA needs to complete the annual statutory audit without surprises.

    12 May 2026Read →
    Bye-Laws & Compliance8 min read

    Statutory Registers Every Maharashtra Housing Society Must Maintain

    Missing statutory registers are the most common audit finding for Maharashtra housing societies. This is a complete list of every register required under the model bye-laws.

    14 May 2026Read →
    Bye-Laws & Compliance7 min read

    What Is a Sinking Fund in a Housing Society? Rules, Rates & Compliance

    The sinking fund is one of the most misunderstood financial requirements for housing societies. Here is what it is, what the bye-laws require and how to manage it properly.

    8 May 2026Read →
    SocietyBee

    Built in Mumbai by Simplifyne Technologies Private Limited. Serving housing societies across India.

    Enquiries

    +91 95949 04493
    admin@societybee.in

    Product

    • Billing
    • Collections
    • Accounting
    • Reports & Compliance
    • BeeAgent AI
    • For CAs & Accountants
    • For Treasurers
    • For Managing Committee

    Resources

    • Docs
    • Blog
    • Glossary
    • SocietyBee vs MyGate
    • SocietyBee vs ApnaComplex
    • SocietyBee vs SocietyRun
    • SocietyBee vs NoBrokerHood
    • SocietyBee vs Excel

    Company

    • About
    • Trust & Security
    • Pricing
    • Early Access
    • Book a Demo
    • Contact
    • Privacy Policy
    • Terms & Conditions
    • Refund Policy

    🇮🇳 We serve housing societies across India

    Operating team based in Mumbai.

    © 2026 Simplifyne Technologies Private Limited.

    All rights reserved.